Saturday, February 6, 2010

JAN 2010: Rancho del Oso

The first trail work day was by the coast at Rancho del Oso. They wanted some trees taken out and one of the things I don't think fits our job description: WEEDING.

We had a long time member, Dale, showing up all the way from Texas. He has the longest commute of any member.



We cleared 4 trees from the side of the deck. Before we started you could not see the deck from this view.
After lunch we headed out on the trails where one group planted sign posts and I took another to cleared the trail from Alder camp ground to the park HQ.




It was a satisfying day and it stayed foggy all day. Some of us finished the day with a pint at the Davenport Roadhouse.

See you on the trail - Jeff

DEC 2009: Rainy Day and Good Food

This was the Trail Crew's 2nd annual gathering. This year we had it at our home in Boulder Creek. Jeannine and I had just completed a kitchen remodel and were excited to do some real cooking. The crew showed up around 1 pm after a short but wet day. We had a fire going and the food was just about ready.

I think the biggest hit was the pot roast but I preferred the garlic rosemary leg of lamb. We had plenty of veggys from roasted butternut squash and sauteed green beans.There was pumpkin pie, pecan pie, and Fran brought a fantastic pumpkin cheese cake. It was nice to have everyone over and enjoy the stories and conversation.

See you on the trail - Jeff

NOV 2009: A Walk in the Park


This Cedar Waxwing was found on Hwy 9. I was so tame just sitting in our hands. The plan for the day was to clear a redwood off of STS trail but when we got there it was already open.

All day we follow the same route that the State crew did a week earlier. It was a nice walk an there were numerous mushrooms. We had lunch on Middle Ridge fire road near Johansen fire road with three baby rattle snakes. Luck for us it was a cool day and no one sat on them before we noticed them.









This was the tree we were after to clear. I brought the whip saw but we didn't get a chance to use it.


See you on the trail - Jeff

Wednesday, December 9, 2009

OCT 2009: Lady Bugs


Hey everyone,

It was a beautiful day and we worked along Creeping Forest in the morning. We clear a 10" Tan Oak and then did some hiking to the kiosk at the bridge on No. Escape Rd. at Hollow Tree Trail. There we had lunch and was treated to tens of thousand of lady bugs.



After Lunch we hiked down STS in search of a downed redwood. It was over 4 foot in diameter and we only had a 24" bar saw with us. We cleared out the branches to uncover the trail and decided to return the next month with Big Bertha (A Husqvarna saw with a 48" bar that was given to BBVTC by the Sempervirens Fund. The saw was given to Mary King by the Howard King as a wedding present).

There we 8 members out and we work until around 3:30 but we had a total of 52 volunteer hours by days end.

The Lady Bugs were the high light of the day and we had seen them about 4 years ago in the same place but I think it was in the spring.


See you on the trail - Jeff

Tuesday, December 9, 2008

Big Basin Volunteer Trail Crew – 2008 Report

2008 was a good year for the Big Basin Volunteer Trail Crew (BBVTC) with a total of 1,049 hours worked over 14 workdays with the average day being 7 hours long. The 1,049 hours worked this year is up from 877 in 2007 and 755 in 2006.

The year included two special workdays. In April we worked in the San Lorenzo Forest section of Castle Rock State Park to assist the Sempervirens Fund in preparing the Michael’s Loop Trail for their summer docent lead hikes in this still restricted area. In August we worked with the state park trail crew in rerouting a section of the Shadowbrook Trail near the Shultz Bridge due to a downed fir that had narrowed the trail for many years.

The most unusual event was in February when a tree that we were removing from the Sunset Trail burst into flames. It was an area that had a controlled burn in the fall of 2007 and it was obvious the tree that had fallen across the trail had been burned in the fire. As we cut into the blackened tree on the trail, small wisps of smoke began to rise from the cut. As the cut was completed and the tree opened up small licks of flame jumped from the opening and we realized the fire was still burning from several months ago. The immediate area had been blackened in the control burn and it was cold and damp so there was no danger of the flames spreading, but the trail was very warm from the smoldering tree, even after several hours.

Two big projects consumed a lot of time during the year. In September, the BBVTC was an official sponsor along with REI and State Parks of the Vo-Cal weekend project that brought over 100 community volunteers to work in the park. This was a two-day event on the Sequoia Trail that included work on reroutes, installation of turnpikes in several wet areas and rebuilding the steps leading from the trail down to the Sempervirens Falls area. Also, due to lack of State Park funding the BBVTC worked with the Mountain Parks Foundation to fund the t-shirts for the Vo-Cal volunteers.

The other big effort in 2008 was the design and printing of a BBVTC brochure and poster that could be used in the recruitment of new members. This work was completed just before the Vo-Cal weekend and information was distributed to many of the volunteers. As the year ended, several contacts from the Vo-Cal weekend had been out to work with the Trail Crew.

Mike Peasland